Rubber Stopper Plug Used for Machine Parts

FOB Reference Price:Get Latest Price
$0.01 - $0.05 / Pieces | 5000 Piece/Pieces (Min. Order)
Shipping:
Support Express · Sea freight · Air freight
Report Suspicious Activity
Overview
Quick Details
Brand Name:
Sanmeng
Model Number:
Customized
Standard or Nonstandard:
Nonstandard
Name:
Rubber Stopper Plug / Silicone Stopwater Plug Used for Machine Parts
Color:
Red,black,green and so on
Size:
Customer Demand
Certificate:
FDA SGS
Specification:
Made as your drawings or samples
Materials:
Silicone,rubber and so on
other name:
Rubber Stopper Plug
keyword:
rubber plugs for hole
Product name:
silicone rubber hole plug
Supply Ability
Supply Ability:
60000 Piece/Pieces per Week
Packaging & Delivery
Packaging Details
Plastic Bag&Carton Box
Port
Qingdao

 Rubber Stopper Plug  Used for Machine Parts

 

Specifications:

 

1. Certification: ISO9001: 2000, RoHS, REACH, FDA, SGS, UL

2.material: Silicone, EPDM, NR, NBR, SBR, CR, viton, IR, IIR, FKM, PVC, FFKM,HNBR,PTFE, polyurethane, ABS and so on.

 

 

Item

Description

Material

Silicone, EPDM, NR, NBR, SBR, CR, viton, IR, IIR, FKM, PVC, FFKM,HNBR,PTFE, polyurethane, ABS and so on

Packing 

Inner-Plastic Bag; Outer -Standard Carton Box

Usage

All kinds of cars, machinery, home appliance, electronic products, electric appliance, stationery, computers, power switches, miniature switches, architecture, commodity and A/V equipment, hardware and plastic molds, sports equipment and gifts, and more

Provide Service

Rubber injection molding, Rubber transfer molding, Rubber compression molding, Rubber to metal molding, Custom rubber molding



Feature:


1.Strong point:We have our own factory,so the price can be competitive and the quality is reliable.

2.we win by the high quality and then have a long-term business relationship.

3.We can provide various size and colors according to customers' requirement.

4.Small quantity is accepted as the trying order to check our quality.

5.OEM and ODM orders are also welcome

6. Lead time of samples: 10 working days.

7. delivery time: 1-2weeks

8.Payment Terms:down payment 30% by TT in advance and the balance 70% before shipment